Product Details:
Payment & Shipping Terms:
|
Power Output: | 3w | Color: | Stainless Steel |
---|---|---|---|
Phase: | Single Phase/ 3 Phase | Room Volume: | (cubic Meter): 3~6 |
Aroma pump for steam bath with twin aroma oil work with any brand steam generator
TOLO Steam Bath Generator Quick Detail:
Steam generator Type: For Wet Roma Steam bath
The improvements of TOLO steam generator differ from the other brand generator:
If one steam generator doesn't have perfect drain system, its quality is always not good enough.
TOLO steam generator use 34" full-bore.(Full-bore: full-bore straight-through type with connection between valve andpipeline or straight pipe, equal sectional area and "0" loss of flow.) It solved the water scale block the drain valve problem.
There has four valves in the steam generator industry. They are manual drain valve, old type automatical drain valve, automatical push-pull drain valve and our 3/4" full-bore auto drain valve. These 3 valves except our 3/4" full-bore auto drain valve, all of them have different problem.
1.Manual drain valve: you have to drain by yourself after each time steam bath.
2.Old type automatical drain valve: the pipe is too small. Once there has some water scale in the water tank. After some months, the drain valve will be blocked.
3.Automatical push-pull drain valve: sometimes it will not push back after it pulled, and there has leakage probelm.
4.At last, our 3/4" full-bore auto drain valve is testing for several years without any problem. Only TOLO steam generator has 3/4" full-bore auto drain valve.
TOLO Stainless Steel Steam Bath Generator Description:
Applications:
For 3~6m³ residential and commercial steam baths
A daily steam bath is a remarkable way to indulge yourself. It causes the perspiration that is the single healthiest thing you can do for your skin. Stress and negativity quickly dissipate in the soft clouds of intense yet comforting heat. A few minutes of steam daily, in the comfort of your own home, is an opportunity to improve your overall well-being in every way.
Specifications:
Over-heat Protect function:
We keep "Safety First". After serval years serving time, the steam generator parts may aging, like main circuit board , water level sensor, heating element etc. But don't worry about this, we have over-heat protect function.It will protect you far way from dangerous. Once the steam generator has boil dry heating, the steam generator will power off automatically.
Parameters:
Model |
Power KW |
Room volume (m³) |
Power requirements 50/60Hz |
Current (A) |
Power wire (Copper) N*mm2 |
Dimensions CM |
Packing dimensions CM |
Gross weight kg |
TOLO-E30 |
3.0 |
2~4 |
220-240V~ |
13.6 |
3*2.5 |
42.5*16*30 |
54.5*21.5 *42 |
10.5~11 |
TOLO-E40 |
4.0 |
3~5 |
220-240V~ |
18.2 |
3*2.5 |
|||
TOLO-E45 |
4.5 |
3.5~5.5 |
220-240V~ |
20.5 |
3*2.5 |
|||
380-415V3N~ |
6.8 |
5*1.5 |
||||||
TOLO-E50 |
5.0 |
4~6 |
220-240V~ |
22.7 |
3*2.5 |
|||
380-415V3N~ |
9.1 |
5*1.5 |
||||||
TOLO-E60 |
6.0 |
5~7 |
220-240V~ |
27.3 |
3*4.0 |
|||
380-415V3N~ |
9.1 |
5*1.5 |
||||||
TOLO-E70 |
7.0 |
5.5~8.5 |
220-240V~ |
31.8 |
3*6.0 |
47.5*18.5*45 |
53.5*23*59 |
15.6~16.2 |
380-415V3N~ |
11.4 |
5*2.5 |
||||||
TOLO-E80 |
8.0 |
7~10 |
220-240V~ |
36.4 |
3*6.0 |
|||
380-415V3N~ |
13.6 |
5*2.5 |
||||||
TOLO-E90 |
9.0 |
8~11 |
380-415V3N~ |
13.6 |
5*2.5 |
16.4~17 |
||
TOLO-E105 |
10.5 |
9~12 |
380-415V3N~ |
15.9 |
5*2.5 |
|||
TOLO-E120 |
12.0 |
11~14 |
380-415V3N~ |
18.2 |
5*2.5 |
|||
TOLO-E150 |
15.0 |
13~18 |
380-415V3N~ |
22.7 |
5*2.5 |
51*18.5*46 |
56.5*23*59 |
17.5~18.5 |
TOLO-E180 |
18.0 |
16~22 |
380-415V3N~ |
27.3 |
5*4.0 |
|||
TOLO-E225 |
22.5 |
21~28 |
380-415V3N~ |
34.1 |
5*6.0 |
|||
TOLO-E240 |
24.0 |
22~30 |
380-415V3N~ |
36.4 |
5*6.0 |
|||
Notice: TOLO-E steam generator are equiped with auto drain system. 9~12 KW units could be customized to 220~240V on request. |
Competitive Advantage:
Every TOLO-E steam generator is subjected to 6 strictly controlled tests:
1. 48 hour continual test for circuit board
2. Controller is tested for all functions
3. High voltage test
4. Earthing resistance test
5. Power test.
6. Operational test of every steam generator before packing